Here's 3 of a switch I completed this week.
[Linked Image from i1136.photobucket.com]
[Linked Image from i1136.photobucket.com]
[Linked Image from i1136.photobucket.com]

Just need to heatshrink the end and done.


But in reality, higherups called for braiding the cables, which I have no pictures of. I hate braiding cables.

Also, please note that that mx80 is supported by a 0u shelf on the bottom, only able to secure with two screws on the top. Bottom holes were covered/occupied by shelf. there's another relay rack in back of the front relay rack supporting the back end of the equipment.