If there is not enough slack in the suite to mount a block on the end of the cable, I think I would do a semi-permanent 25 pair splice in the ceiling below with either BIX or 110 block (or even a pair of amphenols) to extend the full 25 pair cable to a 66 block in a good spot somewhere within the suite.