Just wanted to add that in my last post, I was referring to the new job.... not the "cabling demo" post....

Look at the bright side - I bet after you get the other 90% ripped out, you can get a pretty good price for the scrap copper. Then again, I don't know if they give less for it being insulated.

And as far as the power pole in the ceiling, I think I figured that one out. Did a bit of googling, and found a pic of the original owners of the building:

https://img292.imageshack.us/img292/5315/ownersew6.jpg