We spent the day on site. We fished twine between outlets on the main floor and the ceiling space in the basement. Had to pull base board back in a few places. Drilled down beside the modual furniture in some places. Used long bit to drill down and 3" hole saw to drill holes in the basement ceiling. Going back on Friday to finish. Have to fire caulk holes. Site manager said do what ever it takes. There was no splitting cables. Free standing rack in center of room telephone on the wall.