|
|
Joined: Mar 2004
Posts: 488
Member
|
OP
Member
Joined: Mar 2004
Posts: 488 |
We spent the day on site. We fished twine between outlets on the main floor and the ceiling space in the basement. Had to pull base board back in a few places. Drilled down beside the modual furniture in some places. Used long bit to drill down and 3" hole saw to drill holes in the basement ceiling. Going back on Friday to finish. Have to fire caulk holes. Site manager said do what ever it takes. There was no splitting cables. Free standing rack in center of room telephone on the wall.
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
Forums84
Topics94,326
Posts638,992
Members49,781
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
68
guests, and
106
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|