I was told that if you measure the circumference of a solid number six ground wire and then do the same with each individual strand of a stranded number six you will get a larger over all circumference plus in addition to the flexability of stranded.
PS: I did have a situation where my crew had to change out numerious solid ground wires to stranded per the inspector.


Forty six years and still fascinated with Telecommunications!