|
|
Joined: Feb 2012
Posts: 105
Member
|
Member
Joined: Feb 2012
Posts: 105 |
The Western Elec 901B power plant is used for up to 10 modular panels. My question is can you have two 79B2 power plants (max 4 modular panels) power 8 modular panels. The lines from the modular panels that are powered by two 79B2 would appear on same sets. Eg: A ten button set would have some lines from a modular panel powered by one of the 79B2 units and other lines from the modular panels served by the 2nd 79B2 unit. Wanted to be sure that I don't short anything out. Thanks for the advice! Jim
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: May 2007
Posts: 5,058 Likes: 5
Moderator-1A2, Cabling
|
Moderator-1A2, Cabling
Joined: May 2007
Posts: 5,058 Likes: 5 |
I never worked on those units but I don't think you'd have a problem.
Make sure the grounds on both power supplies are tied together (commoned).
Sam
"Where are we going and why are we in this hand basket?"
|
|
|
|
sts pft
by davetel - 01/14/25 01:31 PM
|
sts pft
by davetel - 01/11/25 06:42 PM
|
|
|
Forums84
Topics94,461
Posts639,657
Members49,825
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
54
guests, and
43
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|