|
Joined: Jan 2005
Posts: 15,384 Likes: 13
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,384 Likes: 13 |
That's what I thought. Yeah, they get pretty angry when you mess with those. You'll definintely need to get VZ out there for that one.
Ed Vaughn, MBSWWYPBX
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Jan 2004
Posts: 6,648
RIP Moderator-Nisuko-Tie, General
|
RIP Moderator-Nisuko-Tie, General
Joined: Jan 2004
Posts: 6,648 |
thats what Ive always done , but seeing the "other guys " doing it I wanted to be sure I wasn't missing anything
Skip ------------------------------------
Serving SW and West central Fl since 1984
|
|
|
|
Joined: Jan 2005
Posts: 15,384 Likes: 13
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,384 Likes: 13 |
The only problem is that knowing Verizon, they won't simply move it. They will order up an entire new circuit to parallel the existing one and then transfer the service to it. Such efficiency.
Admittedly, I have moved them many times and nobody said a word, but today's Verizon isn't the same company it used to be, so I am not willing to risk it. Just plan on this process taking a full 21-day circuit build interval to be accomplished.
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: Dec 2005
Posts: 2,928
Member
|
Member
Joined: Dec 2005
Posts: 2,928 |
ED...do not forget the disco in error, or the failure to swing the old lines to the new ckt. Also the ticket will need to go to cable maint. since they will not have any spare pairs that quilify for high cap ckts.
I Swear I did not touch anything
|
|
|
|
Joined: Jan 2005
Posts: 15,384 Likes: 13
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,384 Likes: 13 |
You're right, but please don't get me "stah-ted" on that issue, Anthony. My therapist has me keeping the soap box under control for now, but triggers might make me drag it out against my therapist's orders.
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: Dec 2006
Posts: 1,516
Member
|
Member
Joined: Dec 2006
Posts: 1,516 |
It seems like the provider could simply extend or relocate their demarc versus building parallel circuits. I hope we're not seeing big headaches on the Verizon.
Ed, "Stah-ted?" You mean like trying to "Pahk yah kah in thah gah rahge?"
|
|
|
|
Joined: Jan 2005
Posts: 15,384 Likes: 13
Moderator-Vertical, Vodavi, 1A2, Outside Wire
|
Moderator-Vertical, Vodavi, 1A2, Outside Wire
Joined: Jan 2005
Posts: 15,384 Likes: 13 |
No, Mike. It was meant with more of a New York flex on things, as in "you tawlkin ta me?".
Ed Vaughn, MBSWWYPBX
|
|
|
|
Joined: Jan 2004
Posts: 6,648
RIP Moderator-Nisuko-Tie, General
|
RIP Moderator-Nisuko-Tie, General
Joined: Jan 2004
Posts: 6,648 |
Originally posted by ev607797:
Admittedly, I have moved them many times and nobody said a word, but today's Verizon isn't the same company it used to be, so I am not willing to risk it. Just plan on this process taking a full 21-day circuit build interval to be accomplished. the 21 day is what concerns me , along with the $$$ customer needs to move by 4/9 I told him I can have cabling ready by Monday certainly I can find the pairs and move it maybe my question really is will the circuit come back up ? and whats worst case if I do move it and it doesn't come back up ? it gets reported as trouble and we go from there ? (maybe I should try moving it Monday if it comes up we know were good to go if not I move it back and report it as trouble )
Skip ------------------------------------
Serving SW and West central Fl since 1984
|
|
|
|
Joined: Sep 2005
Posts: 472
Member
|
Member
Joined: Sep 2005
Posts: 472 |
skip555 They work on trouble tickets faster than a move! Makes you go hmmmm! :shhh:
|
|
|
|
Joined: Aug 2003
Posts: 5,154 Likes: 3
Moderator-Vertical, Vodavi
|
Moderator-Vertical, Vodavi
Joined: Aug 2003
Posts: 5,154 Likes: 3 |
If you move it, don't do your usual quality workmenship. If they come in and see a nice neat install, it will tip them off that someone else relocated their equipment.
Could you possibly just extend the circuit until Verizon can move the smart jack?
|
|
|
Forums84
Topics94,428
Posts639,501
Members49,821
|
Most Online5,661 May 23rd, 2018
|
|
2 members (Toner, Carl Navarro),
360
guests, and
64
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|