|
Joined: Dec 2002
Posts: 9,428 Likes: 1
Member
|
Member
Joined: Dec 2002
Posts: 9,428 Likes: 1 |
Jeff Moss Moss Communications Computer Repair-Networking-Cabling MBSWWYPBX, JGAE
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Dec 2005
Posts: 9,179 Likes: 8
Spam Hunter
|
Spam Hunter
Joined: Dec 2005
Posts: 9,179 Likes: 8 |
Couldn't even spring for a rack-mounted UPS and power strips.
I Love FEATURE 00
|
|
|
|
Joined: Dec 2002
Posts: 9,428 Likes: 1
Member
|
Member
Joined: Dec 2002
Posts: 9,428 Likes: 1 |
hope y'all are finished with dinner...
Jeff Moss Moss Communications Computer Repair-Networking-Cabling MBSWWYPBX, JGAE
|
|
|
|
Joined: Jul 2006
Posts: 2,750 Likes: 18
Admin
|
Admin
Joined: Jul 2006
Posts: 2,750 Likes: 18 |
I tried those 1' patch cords. They suck, especially when you need to pull the patch panel out to add more drops! What, maybe $19 (tops) for cable management? Still looks better than the rat's next on the top. Oh wait, those are swell drip loops.
Carl
This model is end of life
|
|
|
|
Joined: Mar 2018
Posts: 345 Likes: 1
Member
|
Member
Joined: Mar 2018
Posts: 345 Likes: 1 |
We have moved almost entirely to unpopulated patch panels. To help with the add wires later issue.
The Cloud is just someone else's computer!
|
|
|
|
Joined: Dec 2005
Posts: 9,179 Likes: 8
Spam Hunter
|
Spam Hunter
Joined: Dec 2005
Posts: 9,179 Likes: 8 |
Spaghetti central!
I Love FEATURE 00
|
|
|
|
Joined: Dec 2005
Posts: 9,179 Likes: 8
Spam Hunter
|
Spam Hunter
Joined: Dec 2005
Posts: 9,179 Likes: 8 |
The conversation about this picture is happening in the photo forum. Trying to move it here, is this cabling CPE or just poor LEC cable management?
I Love FEATURE 00
|
|
|
|
Joined: Aug 2006
Posts: 1,805 Likes: 11
Moderator-Iwatsu
|
Moderator-Iwatsu
Joined: Aug 2006
Posts: 1,805 Likes: 11 |
Looks like a combination of both. I have a couple customer sites that looked like that until we cleaned them up. A job like this is where patience is learned.
Sometimes the thoughts in my head get so bored, they go for a stroll through my mouth. This is rarely a good thing.
|
|
|
|
Joined: Dec 2005
Posts: 9,179 Likes: 8
Spam Hunter
|
Spam Hunter
Joined: Dec 2005
Posts: 9,179 Likes: 8 |
Are these blocks intended to be touched by CPE vendors? I've been under the impression that the LEC would cross-connect from here to blocks that run to other locations (risers) and CPE vendors would take it from there.
I Love FEATURE 00
|
|
|
|
Joined: Sep 2018
Posts: 68
Member
|
Member
Joined: Sep 2018
Posts: 68 |
The wide blocks with 6 posts across are for CPE.
All the customer wires should be punched down on them once and never touched again unless there was a problem on the block itself.
The LEC leaves jumpers with a tag on them, or terminates onto a special 66 block with a LEC cover on it.
This arrangement is almost never followed, lots of LEC techs dont know how to 66 block, and I swear even more customer techs dont know either.
The big black cable on the left going to blocks makes me think this is a big east coast city. The midwest and west coast are way too uptight about lightning/high voltage to allow unprotected pairs like that.
|
|
|
|
ESI 50.
by Gary S. - 11/21/24 07:34 AM
|
|
|
|
Forums84
Topics94,439
Posts639,543
Members49,823
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
46
guests, and
22
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|