|
|
Joined: Aug 2006
Posts: 89
Member
|
Member
Joined: Aug 2006
Posts: 89 |
Originally posted by 1864: I'm confused. Wait until the drywall is up? :confused: Seems like alot of extra work. Not compared to re-pulling new lines that were damaged by the drywallers. If your that woried, bid in flex duct and install it yourself, then pull your cables after the drywall is up.
Kirk Herron A mistake on your part does not constitute an emergency on my part. CCSG, Inc. www.ccsgweb.com
|
|
|
Visit Atcom to get started with your new business VoIP phone system ASAP
Turn up is quick, painless, and can often be done same day.
Let us show you how to do VoIP right, resulting in crystal clear call quality and easy-to-use features that make everyone happy!
Proudly serving Canada from coast to coast.
|
|
|
Joined: Jan 2002
Posts: 2,328
Moderator-Comdial
|
Moderator-Comdial
Joined: Jan 2002
Posts: 2,328 |
The last wood construction site I did, we used this stapping . Cut to length and screw down. It's also useful for mounting items like modems, routers and other material to a wall.
|
|
|
|
Joined: Mar 2004
Posts: 488
Member
|
Member
Joined: Mar 2004
Posts: 488 |
When I quoted the job I didn't include pipe stubs. I was give some plastic staples that I had forgotten about until they were mentioned on this post. Being as it open ceiling I had to drill in the walls. Thanks for all your help.
|
|
|
|
Joined: Feb 2005
Posts: 12,349 Likes: 4
Member
|
Member
Joined: Feb 2005
Posts: 12,349 Likes: 4 |
I'm confused. Wait until the drywall is up? Seems like alot of extra work...
The reason is to protect the cables from the other trades. I like to get in as late as possible for this reason.
Whether or not you can use this approach depends on the construction. Normally you can do this in commercial construction with a hung or dropped ceiling. If you are lucky you may have the situation where the partitions are open above the ceiling with no top plate and no insulation. You can pretty much just drop the wire down the bay to your ring. Other times you will encounter top plates, sheetrock run all the way up and insulation. Even with insulation it's easy enough to fish. If you can, install a drag line before the rock gets hung. Then you have the best of both worlds.
-Hal
CALIFORNIA PROPOSITION 65 WARNING: Some comments made by me are known to the State of California to cause irreversible brain damage and serious mental disorders leading to confinement.
|
|
|
|
Joined: Oct 2006
Posts: 291
Member
|
Member
Joined: Oct 2006
Posts: 291 |
We also wait till the rock is up, in case of knee high walls, we go in when they have one side up.
Voice/Data & Cable Contractors, Avaya/Lucent, Nortel and Panasonic Serving Central Fl
|
|
|
Forums84
Topics94,465
Posts639,682
Members49,828
|
Most Online5,661 May 23rd, 2018
|
|
|
|
|