|
|
|
Joined: Oct 2006
Posts: 1,368 Likes: 5
OP
Member
|
More hanging equipment
The previous levitating rack reminded me of a job I had a few years ago. The upstairs telephone room was removed and replaced. The floor and wall were removed, equipment had to hang from the ceiling overnight. The next day a new floor was installed. Equipment was eventually moved to the other end of the building.
That's a telco demarc and a Nortel CICS hanging there.
Jim (well, this is embarissing. I wanted this in Ugly Work. And it's too late to delete. Sorry.)
Last edited by Yoda; 10/13/17 10:40 PM.
|
|
|
Forums84
Topics94,120
Posts638,008
Members49,726
|
Most Online5,661 May 23rd, 2018
|
|
0 members (),
70
guests, and
25
robots. |
Key:
Admin,
Global Mod,
Mod
|
|
|
|
|